pinterest-dd591.htm Oak Creek Academy

Wednesday, July 29, 2009

Humming Birds

We get a number of animals in our yard, most are not domestic pets. Suppose that's not a surprise as we back up to park land and live at the end of the street (almost, second to last). Thought I'd try to get a picture of a hummingbird this go around. Each time I try, the pictures are getting a bit better. Here's what I've gotten so far:

Not the best, as the picture is washed out (through a window
and screen and maxed out on zooming). You can
still tell it's a humming bird in flight.

A hummingbird checking out new "bird juice" and location
of feeder so I could hopefully get better pictures from inside.

Suppose it tastes okay!

Monday, July 27, 2009

Clean-up

The construction crew is just cleaning up today. Hope this means we're about finished with the new bathroom!!!! The mirror, towel rake, and towel paper holder have been installed. They've also cleaned up the floor in part of the utility room that they were working in. There's still a lot of tools to be lugged out though. I won't hold my breath till it's finished - I've kind of gotten used to breathing.

Later tonight, I'll take a couple more photos and post them on this entry.

P.S. Here's the photo's of a job 98% done (still need a hand towel, toilet paper, trash can)




Here's the new door to the utility room. The old door was right at the bottom of the steps. The new one is further back.












The new 1/2 bath!! All that is left to do is put in a towel, toilet paper, and a trash can.












New area for our fridge, freezer, and bakers rack. The wall, in the fore ground, is the outside back wall of the bathroom.

Thursday, July 23, 2009

PAINT

We're on the home stretch with the basement remod (the bathroom portion anyway)!! Paint is going up in the bathroom, foyer area, and part of the utility room that they worked on. I am hoping that there will be time to faux paint before the sink and toilet get put in. Hopefully I'll be able to paint tonight, after VBS, and take some pictures. If there is success, I'll add photo's to this post later.

P.S. There were a number of days that where sanding spackle, filling holes again, more sanding, or priming the walls took place. Those days didn't make for good photo's. Stay tuned though, if you're following our remod.

The photo doesn't show the sponge painting well, but did a heavy sponge
about 4 1/1 feet and lighter below. Hopefully pictures will look better
with the sink, toilet, mirror, towel bar, and toilet paper holder in.

Thursday, July 16, 2009

Bathroom Remodeling

We have drywall and it's in. The bathroom is coming along and sure seems like it will be usable soon. Looking forward to being able to use it. Here are some more photo's.


Drywall in the new bathroom. It'll be small, but functional. Yeah!!
Our basement is almost finished.

Pocket door separating the rec room and utility room. Still needs to be painted
and trimmed, but it's getting there!!!

New area for our fridge, freezer, and bakers rack. It will almost be like a mini
kitchen. Notice the light switch? We finally have the utility room
and rec room on two different set of switches. How long until
we remember to turn off the utility room?

Tuesday, July 14, 2009

Christmas in July

It's been a little over a year since I blogged about Christmas in July. Last year (7/2/08) it was Thing Two KNOWING Santa would bring him certain gifts. Well, Santa didn't pull through exactly like he wanted, but they got the desired lego's.

This year, UPS delivered. It was our box from Rainbow Resources. A few books, workbook, spelling books, fun science, and unnamed Christmas Presents for Thing One and Thing Two. It's was hard opening the box without the boys getting all excited about it. Should be fun!!

Monday, July 13, 2009

Lost Track . . . .

of the number of days that the crew has been here building our bathroom. Okay, not totally, it's 5 or 6. Electrical issues have been worked out, bathroom is vented to the outside, bathroom has a light. Now to wait on inspections and the rest will go quickly, I hope.

Thursday, July 9, 2009

Day Two and Day Three Photos

It's felt like a long three days so far with the basement remodeling. They're making progress, but still seems like a lot of work.
DAY TWO
Photo of rough in for the toilet

Framing of the back wall

DAY THREE
A lot of framing and plumbing went on today. Here are a few photo's.

Looking through the framed bathroom door.

Outside corner of the bathroom. It's diagonally opposite from
from the bathroom door.

Water supply for the sink and toilet are in
as well. Looks like the county inspector will be
in soon to look at the work.

Tuesday, July 7, 2009

Day One - New Bathroom


Construction has begun. It's been noisy, but they've done a good job containing the mess. Here's a picture of the broken concrete.