pinterest-dd591.htm Oak Creek Academy: Mr. Gumpy's Motor Car
Showing posts with label Mr. Gumpy's Motor Car. Show all posts
Showing posts with label Mr. Gumpy's Motor Car. Show all posts

Friday, November 6, 2009

Finally Friday!!!

Yes, finally Friday. We've wrapped up our school week this morning with science and a lesson on friction for both. They enjoyed experimenting with ice, sand paper, hardwood, cloth, and pledge.

Seeing how easy it is to "skate" across the hardwood
on rags. It was fairly easy, even easier after I sprayed
Pledge on the floor. Yes, I really did. I've also cleaned
it up well after with vinegar. It's not to slippery now.

Trying to skate barefoot. Definitely the more difficult option.

The boys first rubbed ice against ice. This slipped fairly
easily. Second, they tried rubbing ice on a piece of sand paper
that was on the ground. A little more difficult. Third, they tried
to sand the sand paper, while pressing down. This was the hardest
to do. This was to show how friction works with two rough
surfaces rubbing against each other versus being lubricated.

Monday, November 2, 2009

Monday Musing

It's still early today (5:41 AM by our Set Top Box) or "6:41 AM before we changed our clocks" according to Thing One. It is still VERY dark out side, but there is enough light outside to "see" the shine on our vehicles to know that it rained over night. There very well may still be a light mist coming down. Another week begins in the cold and dark.

We'll begin our school week with the second week of "Hanna's Cold Winter" and a week with "Mr. Gumpy's Motorcar". I'm looking forward to this week, because the outside activities have slowed down a bit. On the same note, but not so fortunately, we are battling what may be common colds or could be the flu. Because I just don't know yet, we're trying to take it easy, lay low, and get healthy. Our school days may be a little less organized as a result, but we'll get everything done that needs to be.

On the home remodeling front, progress is being made in the basement. The whole utility room has a dropped ceiling now, the HVAC trunk and steel I beam have been drywalled, and the second window well has been drywalled. Our contractor will be back today to do the final sanding and priming. I'll hopefully be able to paint those areas later today. My end of the job isn't finished though. Another trip to Home Depot for a piece of drywall, more spackle, an outlet cover, HVAC register cover, and return a couple of things.


Window well drywalled

Framing for wall behind sink